
Kitchen Remodels
·
Riverbend
Galley kitchen refresh
Same footprint, smarter layout: more storage, better light and a coffee station.
Budget range
$68k to $75k (sample)
Duration
7 weeks on site
Size
140 sq ft
Year
2025
The brief
A young couple wanted a better kitchen without the cost of moving plumbing or walls.
What we did
Kept plumbing in place to control cost
Ceiling-height cabinets
Under-cabinet lighting
New flooring
Materials and finishes
Painted shaker cabinets
Quartz counters
Zellige-style ceramic backsplash
LED under-cabinet lighting
What made it tricky
The window wall was out of plumb by an inch; we scribed the tall cabinets to hide it.





