How we work

A remodel has a lot of moving parts. Here’s exactly what happens, in order, and how long each stage usually takes (sample).

01

Consult

We start with a call to check fit, then visit your home. We talk through what you want to change, how you live, and a realistic budget. You’ll leave with a rough range, not a sales pitch.

Typical length: 1 to 2 weeks (sample)

01

Consult

We start with a call to check fit, then visit your home. We talk through what you want to change, how you live, and a realistic budget. You’ll leave with a rough range, not a sales pitch.

Typical length: 1 to 2 weeks (sample)

02

Design and price

Under a design agreement, we measure, draw options and help you choose finishes. Our builders price as we design, so the drawings and the budget stay in step. You get a fixed-price proposal with a detailed scope.

Typical length: 4 to 10 weeks (sample)

02

Design and price

Under a design agreement, we measure, draw options and help you choose finishes. Our builders price as we design, so the drawings and the budget stay in step. You get a fixed-price proposal with a detailed scope.

Typical length: 4 to 10 weeks (sample)

03

Permits and ordering

We submit permits and order long-lead items like cabinets, windows and tile, so the build doesn’t wait on materials.

Typical length: 3 to 8 weeks (sample)

03

Permits and ordering

We submit permits and order long-lead items like cabinets, windows and tile, so the build doesn’t wait on materials.

Typical length: 3 to 8 weeks (sample)

04

Build

Your project manager runs the site and the trades. Expect a weekly update with photos, next steps and any decisions we need from you. Changes are priced in writing before we do them.

Typical length: 4 to 20 weeks by project (sample)

04

Build

Your project manager runs the site and the trades. Expect a weekly update with photos, next steps and any decisions we need from you. Changes are priced in writing before we do them.

Typical length: 4 to 20 weeks by project (sample)

05

Walkthrough and warranty

We walk the finished space together and fix anything on the punch list. Then our 5-year workmanship warranty (sample) begins, with a check-in visit at 11 months.

05

Walkthrough and warranty

We walk the finished space together and fix anything on the punch list. Then our 5-year workmanship warranty (sample) begins, with a check-in visit at 11 months.

What we ask of you

Make decisions on time

We’ll give you a selections schedule with dates.

Keep one point of contact

It keeps messages clear and avoids mixed instructions.

Tell us early

If something worries you, raise it. Small issues are easy to fix early.

Payment schedule

Design agreement

Paid in 2 parts, at start and at drawings (sample)

Paid in 2 parts, at start and at drawings (sample)

Build deposit

10% at signing (sample)

10% at signing (sample)

Progress payments

At set milestones (sample)

At set milestones (sample)

Final payment

5% after the punch list is complete (sample)

5% after the punch list is complete (sample)

Sample schedule. Follow your state’s rules on deposits.

Planning a remodel?

Tell us what you have in mind and a rough budget. We’ll let you know honestly if we’re the right fit.

Planning a remodel?

Tell us what you have in mind and a rough budget. We’ll let you know honestly if we’re the right fit.

Planning a remodel?

Tell us what you have in mind and a rough budget. We’ll let you know honestly if we’re the right fit.

Create a free website with Framer, the website builder loved by startups, designers and agencies.